top of page

IF YOU DECIDED TO BUILD A HOUSE ..

If you have decided to build a detached house on a land, you can first meet with us, check the documents and plan the house together. After a project is prepared in accordance with the land conditions and zoning regulations, the conditions of the ground are reviewed by having a ground survey done and static, electrical, mechanical and application projects are drawn up depending on the architectural project. We have the experience to carry out all these stages remotely over the internet.

2023-09-05 (1).jpg

DOCUMENTS AND PROJECTS REQUIRED FOR CONSTRUCTION LICENSE

After all the projects are prepared, if you wish, we can also prepare the urban projects and install and install your construction. According to the law, there must be a site manager in every construction and the person can only be selected from among the architects or engineers, there must be a contractor who carries out the construction. gives the right to be a contractor. 200 m² An auditor company is appointed to control the construction process from the system during the previous construction hours.

TITLE DEED - DEVELOPMENT STATUS - DIAMETER CERTIFICATE

ARCHITECTURAL PROJECT

STATIC PROJECT

GROUND SURVEY REPORT

MECHANICAL PROJECT

ELECTRIC PROJECT

MAP APPLICATION PROJECT

CONTRUCTOR DOCUMENTS

CODOCUMENTS

BUILDING INSPECTION DOCUMENTS

bottom of page